- 08 Dec, 2018 2 commits
-
-
beuchatp authored
Have setup the basic framework of the coordinator connections. Next step to connect all GUI buttons for (dis-)connect, start,stop,off,and select controller. And then test.
-
beuchatp authored
Finished setting up the Battery monitoring node and new parameter service style to match. Needs a GUI reload Yaml to be added and needs to be tested.
-
- 16 Sep, 2018 1 commit
-
-
beuchatp authored
Added files for Picker node and integrated into student GUI, PPSClient, and Paramter service, needs testing
-
- 09 Sep, 2018 4 commits
-
-
Paul Beuchat authored
-
Paul Beuchat authored
-
Paul Beuchat authored
-
beuchatp authored
Added files for the flying agent GUI, currently compiles in Qt but need significantly testing and development for integrating with ROS
-